Ground-Up · Retail
Freestanding Retail Shell
- Size
- 4,000 – 12,000 SF
- Budget
- $1.5M – $4M
- Duration
- 7 – 10 months
Pad-ready site through white-box shell: site utilities, tilt-wall or CMU/steel structure, storefront glazing, and landlord-scope MEP stubbed for tenants.
Where it gets hard: Frontage-road logistics and utility coordination with the jurisdiction — the schedule lives or dies in the first sixty days.
Ground-Up · Flex
Light Industrial / Flex Building
- Size
- 10,000 – 40,000 SF
- Budget
- $2M – $8M
- Duration
- 8 – 12 months
Tilt-wall or PEMB shell with office component, dock-high and grade-level loading, ESFR-ready clear heights, and spec-suite demising.
Where it gets hard: Concrete and steel buyout timing. We lock long-lead structure pricing in preconstruction, before escalation eats the contingency.
Renovation · Occupied
Occupied Office Repositioning
- Size
- 8,000 – 30,000 SF
- Budget
- $750K – $5M
- Duration
- 5 – 12 months, phased
Lobby, corridor, and common-area modernization with tenants in place — phased floor-by-floor with after-hours tie-ins and dust-controlled containment.
Where it gets hard: Keeping rent-paying tenants happy while the building changes around them. Communication plans are part of the contract, not a courtesy.
Adaptive Reuse · Restaurant
Restaurant Conversion
- Size
- 2,500 – 7,000 SF
- Budget
- $500K – $2.5M
- Duration
- 4 – 8 months
Existing building to full-service restaurant: structural openings, grease and ventilation infrastructure, health-department coordination, and FF&E integration.
Where it gets hard: Kitchen equipment lead times and utility upsizing. The hood package gets bought the week the contract is signed.
Tenant Interiors · Medical
Medical / Dental Finish-Out
- Size
- 2,000 – 10,000 SF
- Budget
- $400K – $3M
- Duration
- 3 – 6 months
Clinical finish-out with med-gas, lead-lined rooms where required, specialty casework, and equipment coordination with the practice's vendors.
Where it gets hard: Inspections stack up fast on clinical work. We book jurisdiction and third-party inspections against the schedule from day one.
Renovation · Exterior
Facade & Building Envelope Renewal
- Size
- Varies
- Budget
- $250K – $2M
- Duration
- 3 – 7 months
Storefront systems, EIFS/stucco and masonry repair, roofing coordination, waterproofing, and code-driven accessibility upgrades at entries.
Where it gets hard: Weather windows and business continuity — storefronts stay open while the skin comes off the building.
Completed-project case studies with photos and references available on request.